Heavy Lift Project for General Electric

We collectecd this 105 tonnes Rotor from Dartford, arranged loading to vessel and shipment to Bilbao Spain. The Rotor was delivered in Spain, and the vessel waited in Bilbao and brought replacement Rotor back per Gearless Coaster.